<DIV>We are bouncing ideas over breakfast. The bottom one or 2 bales are gone –
given. There is a new flood level. We are considering that we should replace the
bales with another material such as Hebel blocks (aerated concrete). Still
waiting to eyeball the building. </DIV>
<DIV> </DIV>
<DIV>Any word on the SB you did out outside Rockhampton John. </DIV>
<DIV> </DIV>
<DIV>Chris</DIV>
<DIV> </DIV>
<DIV
style="FONT-STYLE: normal; DISPLAY: inline; FONT-FAMILY: 'Calibri'; COLOR: #000000; FONT-SIZE: small; FONT-WEIGHT: normal; TEXT-DECORATION: none">
<DIV style="FONT: 10pt tahoma">
<DIV> </DIV>
<DIV style="BACKGROUND: #f5f5f5">
<DIV style="font-color: black"><B>From:</B> <A title=larskeller@gmail.com
href="mailto:larskeller@gmail.com">Lars Keller</A> </DIV>
<DIV><B>Sent:</B> Tuesday, January 04, 2011 4:52 AM</DIV>
<DIV><B>To:</B> <A title=GSBN@greenbuilder.com
href="mailto:GSBN@greenbuilder.com">(private, with public archives) Global Straw
Building Network</A> </DIV>
<DIV><B>Subject:</B> Re: [GSBN] Floods in Queensland,
Australia</DIV></DIV></DIV>
<DIV> </DIV></DIV>
<DIV
style="FONT-STYLE: normal; DISPLAY: inline; FONT-FAMILY: 'Calibri'; COLOR: #000000; FONT-SIZE: small; FONT-WEIGHT: normal; TEXT-DECORATION: none">Dear
Chris,
<DIV> </DIV>
<DIV>I have no experience equalling this.</DIV>
<DIV> </DIV>
<DIV>I have 2 experiences with water:</DIV>
<DIV> </DIV>
<DIV>- water seeking down through very localised areas.</DIV>
<DIV>Then what happens always is that the water follows the "flakes" within the
bale. And moves straight down. Creating a black, bad line that can be as
thin as a few centimeters, stretching from the leaking point to where the water
can run out in the bottom.</DIV>
<DIV>What we have managed to do when we have found such a place very early on is
drilling holes through the plaster to the wall, from both sides, and that way
created a draft, which has dried it up so we didnt have to do more.</DIV>
<DIV> </DIV>
<DIV>What is probably more relevant is the following:</DIV>
<DIV>- a workshop where the bales had been put straight on a concrete footer
(bad), with a piece of tar-paper in-between the footer and the wall (ok), but
the tar-paper had been folded up, app. 200mm on each side, creating a huge
water-catchment device (BAD), and the house had no eaves for a long time (BAD),
located in very windy and rainy Denmark, and no plaster (BAD).</DIV>
<DIV>The result was that the bottom 200mm went black and slimy. Absolutely
utterly useless. And from exactly 200mm and up everything was fine.</DIV>
<DIV>There was earthen plaster on the inside.</DIV>
<DIV> </DIV>
<DIV>What we did was the following:</DIV>
<DIV>we took one bale out at a time and replaced it. As it was the bottom bale
and it was plastered on the inside it had been compressed a fair bit, so it was
hard to get the new one in place. We did this by sliding it in between to sheets
of aluminium with handles on. And then two persons on their backs kicking it in.
The earthen plaster on the inside flexed and shook but didnot crack. The length
of the wall app. 40 meters.</DIV>
<DIV> </DIV>
<DIV>All the best,</DIV>
<DIV>Lars</DIV>
<P>
<HR>
_______________________________________________<BR>GSBN mailing
list<BR>GSBN@greenbuilder.com<BR>http://greenbuilder.com/mailman/listinfo/GSBN<BR></DIV></DIV></DIV></BODY></HTML>